Bolsover Canal Gambridge Centenial (medium group)
Cycling Route
Details
38.84 km
131 m
When heading East onto Antquary Rd. ( on the South end of the Centennial Parkway) the dead end is really a path that connects to McKelvy Rd. The latter road is hard-packed dirt. This is the only dirt road you will be on (1.7 km). An out and back to Lock 41 will take you on the canal service road (gravel) as well.