Bay Area Bike Swap Gravel Ride

6
MAY
9:00 AM Saturday
Casual (No-Drop) / Rolling Hills

Join us and the Bay Area Bike Project for a shake out gravel ride before the Swap!

We'll meet up at 8:45am with a planned roll out of 9:00am. Meet up here at the Honey Stinger Ride Station in the first parking lot off of N San Carlos Dr.


This intermediate route will cover ~20miles with ~2,000ft of climbing. Nothing too technical, but there will be steep climbs and steep descents. We'll loop around Shell Ridge and head over to a couple trails on the edge of Lime Ridge before taking the CCC trail back to Heather Farm Park. Plan for 1.5-2 hours.

Please bring your gravel bike or XC mountain bike in good working order along with a helmet, water, and repair kit (honeystinger snacks provided).


Lafayette, California