Dan Smith
Saint Saviour, GuernseyRide
10/02/2013 Spoke through wheel lining/big hole in tube / physically chewed through old inner tube / insert rubber patch beneath broken lining / replace tube / rubbish ride with no mates, dirty fingers and rubbery gob \m/
- Distance23.6 mi
- Time1h 31m 42s
- Elevation1,263 ft

2 Comments